Cross-web layering; separately driven aprons; variable-speed adjustment
Nonwoven web formation and wadding production lines
| Availability: | |
|---|---|
The cross lapper receives a carded fiber web and lays it in overlapping layers to build the required width and thickness. It transfers the layered web to the next production stage. The machine is selected as part of a coordinated nonwoven line, with the carding output and downstream process considered together.
Carded web enters on the input apron, travels through the lapping section and is laid across the output conveyor. Separately driven aprons allow adjustment, while variable-frequency control manages the reciprocating motion.
In a wadding or needle-punched nonwoven line, the cross lapper is positioned after carding and before the selected consolidation stage. The complete line arrangement depends on the intended product.
| Selection Item | Information for Configuration Review |
|---|---|
| Incoming web | Carded fiber web from the upstream carding machine |
| Input web width | Specify the carding machine delivery width |
| Output web width | Specify the required laid-web width |
| Web basis weight | Provide input and target output values in g/m² |
| Web thickness | Provide the target thickness and measuring conditions |
| Operating speed | Match the carding delivery and downstream process |
| Apron drives | Separately driven for adjustment |
| Reciprocating motion | Variable-frequency control |
| Power and installation dimensions | Confirmed for the selected machine configuration |
Input apron width, output web width and machine installation dimensions are different measurements. Please identify each clearly when submitting your requirements. Final speed, power and dimensions are specified in the project quotation for the selected configuration.
Identify the fiber type, length and fineness, including any blend.
Provide the upstream carding width, delivery speed and web basis weight.
Define the required output width, basis weight, thickness and target production rate.
Provide the downstream machine arrangement, connection heights and workshop layout.
Send your material details, finished-product application, required web specifications, available power supply and destination country. Include information about any existing carding or downstream equipment. We will review the line requirements before preparing a project quotation.
Final equipment configuration, pricing, delivery, installation and warranty arrangements are subject to the formal quotation and contract.
Unit 1621, Jinding Mansion, No. 83 Haier Road, Laoshan District, Qingdao, Shandong, China