HSNRL62610W
HSN
84451190
Two 600 mm openers and six 250 mm cleaners; project-specific line integration
Suitable sorted garment and textile waste; subject to material trials
| Availability: | |
|---|---|
The HSNRL62610W is an eight-roller opening and cleaning line with two 600 mm openers and six 250 mm cleaners. The listed line arrangement also includes an HSN903 cutting machine upstream and an HSN711TW baling press downstream. Confirm the equipment included in the final supply scope for your project.
Assess the actual garment or clothes-waste stream before equipment selection. Identify fiber blends, elastane content, coatings, fabric construction, contamination and incoming piece size. Suitable production scraps and sorted clothes waste require different preparation reviews.
Do not assume mixed used garments can be fed directly into the line. Agree sorting, removal of buttons, zips and other unsuitable hard objects, and any cutting requirements before material trials. Detection and separation equipment does not replace feedstock preparation.
Recovered-fiber cleanliness, residual yarn content, length distribution and suitability for rotor spinning or other uses require representative trials. A fixed yarn count, yarn-free result or universal suitability for all textile waste is not guaranteed.
| Item | Opening section | Cleaning section |
|---|---|---|
| Listed units | 2 x HSN600NW | 6 x HSN250W |
| Roller diameter | 600 mm | 250 mm |
| Listed roller speeds | 1000 / 1100 rpm | 1900 / 2100 rpm |
| Main motors | 30 kW + 22 kW | 2 x 11 kW + 4 x 7.5 kW |
| Dust cage diameter | 500 mm | 500 mm |
| Suction fans | 2 x 1.5 kW / 2900 rpm | 6 x 1.5 kW / 2900 rpm |
| Listed section weight | 4300 kg | 4820 kg |
| Listed section dimensions (L x W x H) | 5480 x 1500 x 1330 mm | 6290 x 1500 x 1150 mm |
| Listed reference production rate | 120-180 kg/h | 120-180 kg/h |
These are listed reference values for the two processing sections. The production-rate figures describe the sections and must not be added together. Actual line output depends on material, preparation, feeding, operating settings and connected equipment. Section dimensions and weights are not the complete installed-line footprint or shipping weight.
The existing line description lists PLC control, a magnetic zigzag passage and metal/spark diversion equipment. Confirm the supplied detection, diversion, extraction, guarding and interlock arrangements in the technical offer. These devices do not eliminate all operating risks; the final installation and operating procedures must be reviewed for the project.
Confirm speed settings, motor and fan quantities, complete installed power including cutting and baling equipment, electrical supply, extraction connections, installation clearances, accessories and supply scope in the formal quotation and approved layout.
Send your country, material photos and composition, incoming size, target output, intended recovered-fiber use, site power supply and available floor space. For spinning projects, include the downstream equipment and yarn quality requirements so trial acceptance criteria can be agreed.
Equipment price, delivery, installation support and warranty terms are quoted for the agreed project configuration and confirmed in the contract.
Request an HSNRL62610W Clothes Waste Quote | Discuss Clothes Waste Material Trials
Unit 1621, Jinding Mansion, No. 83 Haier Road, Laoshan District, Qingdao, Shandong, China